Your browser doesn't support javascript.
Show: 20 | 50 | 100
Results 1 - 2 de 2
Filter
Add filters

Language
Document Type
Year range
1.
Buildings ; 13(4):1087, 2023.
Article in English | ProQuest Central | ID: covidwho-2301217

ABSTRACT

Identifying factors influencing the viability of medium, small, and micro scale construction firms (MSMSCFs) is a crucial precursor in positioning such firms to aid economic and infrastructural development, especially in developing countries. This article assesses viability factors that are influenced by building information modeling (BIM) in MSMSCFs amidst construction firms' viability factors. Out of a total of 177 workers surveyed from 59 MSMSCFs that were awarded construction project contracts in sampled institutions in Nigeria, 65 staff members from 31 MSMSCFs were accessed. The factors were ranked and reduced to significant ones through principal component analysis. Ten significant factors influence the viability of MSMSCFs and six of them are enhanced by BIM implementations. All eight component factors and 18 of the 27 variables with high factor loadings can be influenced by BIM implementation. BIM can potentially curb corruption in construction projects and enhance MSMSCFs' quality of service, clients' satisfaction, construction management and technology, professional performance, procurement practices, and prompt payment of work certificates. All stakeholders need to pay prompt attention to factors that can be influenced by BIM to improve the viability of MSMSCFs, thereby hastening BIM adoption and utilization, especially in developing countries.

2.
Journal of Engineering, Design and Technology ; 20(1):201-221, 2022.
Article in English | ProQuest Central | ID: covidwho-1713898

ABSTRACT

Purpose>This paper aims to assess COVID-19 (C-19) pandemic influence in the 37 factors identified from extant literature as factors influencing the viability of local construction firms (LCFs).Design/methodology/approach>A sample size of 65 staff of 31 LCFs that were awarded construction projects contracts in institutions in Nigeria was purposefully selected and accessed based on relevant predetermined criteria. Respondents’ views on factors determining the viability of LCFs were obtained. Factors known to be influenced by C-19 are 25 of the 37 factors rated on a five-point Likert scale of importance by the respondents. Mean scores were used to rank the factors and principal component analysis was used to obtain key component factors (CFs) influenced by the C-19 pandemic.Findings>Six of the first ten “extremely important” and “very important” factors are known to be influenced by C-19 pandemic. A total of 8 CFs having 20 variables with factor loadings of more than 0.5 each were known to be influenced by C-19. The C-19 pandemic influenced LCFs’ cash flow and management of construction labour, plant and equipment amidst variables that had above 0.8 factor loading.Research limitations/implications>A limitation of this study is the inability to conduct close contact interview during this period to obtain personal views on the influence of C-19 on LCFs. However, this does not reduce the quality of findings of this study, as there are valid literature basis hinging this study findings.Practical implications>The paper recommends that all stakeholders pay prompt attention to the factors adversely affected by the C-19 pandemic to improve or at the least sustain the viability of LCFs.Originality/value>This paper fulfils a present pertinent need of assessing the influence of the C-19 pandemic on various factors influencing the viability of construction firms.

SELECTION OF CITATIONS
SEARCH DETAIL